Skip to main content

Subsidence Damage - Ely, Cambridgeshire

  • Value = £55,000
  • Location = Ely, Cambridgeshire
  • Client = Loss Adjuster
  • Summary = Insurance claim for subsidence damage following the desiccation of fenland peat soil
  • Challenge = Demolition of the precast reinforced concrete roof structure without causing structural damage to the main houses
  • Solution = Piled raft completed by specialist sub-contractor to allow a superstructure to be built

Click an image to enlarge