- Summary = Insurance claim for subsidence damage following the desiccation of fenland peat soil
- Location = Ely, Cambridgeshire
- Client = Loss Adjuster
- Challenge = Demolition of the precast reinforced concrete roof structure without causing structural damage to the main house
- Solution = Piled raft completed by specialist sub-contractor to allow a superstructure to be built