Case Study: Subsidence in Bury St Edmunds

Case Study: Subsidence in Bury St Edmunds

 

  • Client = Loss Adjuster
  • Summary = Subsidence insurance repair following a dry summer which caused the clay soil to shrink.
  • Challenge = Open span roof construction of bespoke design.
  • Solution = Traditional deep fill strip foundations with a beam & block suspended floor.

-contractor to allow for the refurbishment to take place

54321
(0 votes. Average 0 of 5)